Read in browser
 
The Daily Memphian – Truth in place.
 
 
Ad
 
Uptown greenline an ‘ending and beginning’ for county trail system
 
By
 
The North Memphis Greenline goes by Grind City Brewing Co. at 76 Waterworks Ave. (Brad Vest/Special to The Daily Memphian)
 

The North Memphis Greenline goes by Grind City Brewing Co. at 76 Waterworks Ave. (Brad Vest/Special to The Daily Memphian)

The North Memphis Greenline formally opened to the public Tuesday. It will eventually connect to the Wolf River Greenway and extend to Shelby Farms Park for upwards of 40 miles of continuous trails. 

 
 

Trending Now

'Zebra crosswalk' brings more visibility to local pedestrians
 
Image Caption
 
Children saddle up for equine therapy at Shelby Farms Stables
 
Image Caption
 
'Critical' portion of Wolf River Greenway could get state funding
 
Image Caption
 
Ad
 
Greenlines, bike lanes, resiliency and the sea change in city planning
 
Image Caption
 
Expert in cycling takes a liking to Memphis' flat terrain, bike lanes
 
Image Caption
 
Calkins: How Memphis (elevation 338 feet) became the unlikely center of the climbing world
 
Image Caption
 
Ad
 
Trolleys gone from two Downtown lines for nearly a decade
 
Image Caption
 
Pedestrian fatalities: the numbers behind the story
 
Image Caption
 
 
Ad
 

.....