Leaving TVA would require transmission network fix
Any change in electricity provider could require changes in that transmission system, MLGW leadership says.
There are 5 article(s) tagged MLGW infrastructure:
Any change in electricity provider could require changes in that transmission system, MLGW leadership says.
The pilot program is starting in the two areas that experience the most frequent and longest power outages: Orange Mound and Sherwood Forest.
An industry group estimates there are 250,000 to 300,000 water main breaks in the U.S. every year — generating an estimated loss of 6 billion gallons of treated drinking water across the country.
Water boils are inconvenient at home but a crisis for restaurants; it’s time to address our aging infrastructure and fix this mess. Meanwhile, sip on some hot buttered rum and welcome in 2023.
An MLGW board member questioned the $299 million capital spend in the utility’s budget. Utility officials say the five-year, $1 billion plan was slowed by supply chain problems and labor problems.
About 5 results