Wolf River Greenway bridges gap to Shelby Farms Greenline
The one-mile section, which includes the Greenway bridge and a boardwalk, formally opened Tuesday, May 17.
There are 2 article(s) tagged Heights Line:
The one-mile section, which includes the Greenway bridge and a boardwalk, formally opened Tuesday, May 17.
The Heights Line has advanced a few more steps toward reality. The design of the 1.75-mile path, a logo and a one-time economic impact study have been completed.
About 2 results