TVA moving ahead with natural gas turbines in Southwest Memphis
The turbines TVA plans to construct are intended to be used when the electric grid sees high demand.
There are 5 article(s) tagged Allen Combined Cycle Plant:
The turbines TVA plans to construct are intended to be used when the electric grid sees high demand.
In the past, TVA has struggled to provide enough power, but environmentalists say the continued investment in natural gas could mean further harm to neighborhoods already surrounded by heavy industrial users.
Memphis has left the Tennessee Valley Authority before, for a period that included the city building its own electric power plant. There are a lot of similarities between various turbulent chapters in the city's relationship with TVA as MLGW leaders again consider an exit from the federal agency.
The 60-year-old Allen Fossil plant is scheduled for demolition in 2022, Tennessee Valley Authority President and CEO Jeff Lyash said Tuesday as leaders got a look at possible future uses for the 500-acre site.
The Tennessee Valley Authority is proposing to build 2.7 miles of new transmission line on the Memphis side of the Mississippi state line.
About 5 results